Concrete Supply Corp experienced a major failure of their aggregate bin on their Morrisville, NC concrete batch plant. The interior bin divider walls had deteriorated to the point that a hole several square feet in area had formed between two of the six bins. While the failure did not affect the bin structurally, it created a material co-mingling nightmare. Concrete Supply Corp. contracted us to provide a new aggregate storage bin and aggregate weigh batcher. We designed an aggregate storage system with them that incorporated their existing structure and conveyor systems. Our field services team facilitated the existing equipment removal and installation of new equipment over the course of 4 days.